Network Rail’s contractor spend table revealed

Network Rail’s rail total supplier spend for the last 12 months came in at £7.5bn, a near-one-billion increase on the previous 12 months (£6.61bn). The top 18 suppliers were responsible for £3bn of the total spend for the period – £200m more than the previous 12 months.

See the full table below.

Leave a Reply

Your email address will not be published. Required fields are marked *